i checked out how long it took me to Sculpt the models i´ll be doing Retopo on so far
and to my fucking surprise, 2 days to Sculpt these models, this is not conuting end Dates
BUT! Yeah got Godzilla done in 2 days it seems, from head sculpt, Tooth Retopo, body sculpting, limb Sculpting, hands, Feet, Plates and poly pianting ALL OF THAT was done in a Span of 2 days (i Started Sculpting him on November the 25th and was done 27th of November)
even more shocking it took the same amount of time for Naoko to be done
(started on her December the 2nd and was done with her on the 4th of December)
im very surpised about this for good reason,
it only it takes me two days to do a model sheet, the same amount of time i has taken me to Sculpt these models, EVERYONE OF THE 8 MODELS I HAVE DONE AT MOST TOOK ME 2 DAYS AT MOST AND A MINIMUM OF 0 DAYS!
im not sure if it was the best thing to use to check and you can check in case you don´t Feel right about it BUT!
it is also worth noteing i too was shocked over it and changed site and... WELP 2 days it took me.
this is not with the Retopology, Multires Sculpting, Textureing, bakeing and Rigging included of course and i´ll likely do a B-Sky theard for that too BUT!
the fact it only took me 2 days to Sculpt a 3D Model of Godzilla is amazing and kinda eye opening for me.
starting on monster zero on sunday, gonna add him to the Theard too when i get him done, only got mechagodzilla done today... A MODEL I THOUGHT WOULD TAKE LONGER AND ACTUALLY SAVED HIM FOR LAST ALONGSIDE MONSTER ZERO, i need to let that settle in for a bit now.