00:00
00:00
Yokomation
Flim maker and 3D animator
(wish you cloud have two aura´s)
Used to be on Youtube, but now im on Newgorunds

Age 26, Male

Vipperødgårds Alle 24

Joined on 6/22/17

Level:
26
Exp Points:
7,043 / 7,510
Exp Rank:
6,159
Vote Power:
6.74 votes
Rank:
Police Officer
Global Rank:
13,712
Blams:
2
Saves:
701
B/P Bonus:
10%
Whistle:
Normal
Trophies:
4
Medals:
12

Yokomation's News

Posted by Yokomation - 11 hours ago


iu_1320841_6434868.webp

Yeah, almost done, right than SOOOOOOOOOOOOOO.

while it is going nicely on sculpting our Dragon here, i also did ask myself why did not not just Do a Quoll Alone model? or something Eaiser right now.SOOOOOOOO(alongside the fact i did go a bit too late to bed in my mind wanna keep that in check) i might not actually do anything else for today and just chill a bit.


PS:

it´s Either What i said about the hornmoth or this short Film that has made me wanna do a Quoll Alone model,

IDK but with the UDIMS i´ll be useing for the hornmoth, i think it´s no wonder why i aksed myself it, but hey gotta Test how fast i Really can do a model, right?


1

Posted by Yokomation - 1 day ago


iu_1320430_6434868.webp

so i did think of a short Animation featureing our hornmoth model that´s comming up

however Rather than just make a soundscape, i thought a Small Storyboard would be a good idea to start from...

a Storyboard that has As a matter of fact resulted in some great news

only done ONE image on it But if you couldn´t tell... she might be back.

iu_1320431_6434868.webp


1

Posted by Yokomation - 1 day ago


yeah might be for the best,

SO getting a hornmoth done, gonna take the time on the Parts of it and all,

getting Started tomorrow on the model, Wanted to do it today BUT! i think to Really See how Far i can get i think it´s best i do it tomorrow, like Start sculpting it and all.

iu_1320330_6434868.webp


while i would like to Start on Willa Brown and indeed, have got things ready for that, i think not to stress myself out too much i´ll start on ONE Model right now for now and it been a hornmoth kinda helps alot on that, i´ll fully rig, fully Texture, Sculpt Retopo it as knowing i can do it in two days isn´t all half bad,

in edition i´ll also try to get eyes ready for OC Models, got Yoko Ruby´s done, tomorrow it´s likely over to Nat, Doily and Kitube, i might not have made the G.P.N project BUT IT HAS CHANGED ME FOR THE BETTER WHEN I NEEDED IT THE MOST

iu_1320331_6434868.webp


1

Posted by Yokomation - 2 days ago


only Took two to three days, nice

all is Setup and Ready for the next bunch of Steps,

Multires Sculpting, Textureing and Basic rigging and weight pianting


also got a basic rig for the texture pianting stage ready, tho now looking at it, i Do kinda wish i had given Godzilla a Redesigin because IDK why but, part of me is starting to dislike the current desigin... either that or maybe the whole Godzilla hype thing is starting to thin out a bit...


it happens ya know and honestly knowing how Quickly i can do sculpts i Guess i can let it pass, knowing i can sculpt characters in less time than i had thought is more than cool to have figured out here

and maybe i should just for now Atleast focus on ONE MODEL and set the amount of Days to see how long it´ll take me to create that one model, knowing the whole two day thing it would be kinda cool to see how fast i can get them done now

iu_1319942_6434868.webp

anyways, im going to call it done for today,

was planning to blockout Willa Brown and hercy BUT! knowing how long it´s taken me to retopo Gojira today, i think it´s better if i don´t, however i did make a good base for future Models, also gonna render out Makoto and Naoko in case i DO Scrap this project for now in favor of focusing atleast for now much smaller Scale animations, want to become better but MAYBE this is too much, i have said it alot but might be something to it, what you think?


1

Posted by Yokomation - 4 days ago


Yeah

Makeing final chocie tomorrow to where i Begin on these Side Sculpts,

tho i have been Doing, Doily, Nat, Kitube, Skittles and Grumpy alot this year and to a less extend with Willa Brown and Hercy, knowing it only Takes 2 to 3 days to get these Sculpts done and getting monster Zero done in less Time i Presume, i think it´s OK, also Reggie would Look Awesome with my new Skills and textureing of course.

iu_1318924_6434868.webp


1

Posted by Yokomation - 4 days ago


iu_1318894_6434868.webp

well that part of the modeling where i´ll Do the Retopo but also textures and some basic rigging, in edition after Goji it´s over to Angi.

infact that is the plans as i think it might be a good idea to do.

I did plan to prepare Godzilla yesterday BUT! sadly i was imensely sick and had a Really Really shitty day, getting better tho and it´s a Good thing i got as far as i did on Godzilla´s model with the Retopo as i have done here NGL,

awesome, anyways tomorrow i´ll get him done... now tho i think it´s time to find some lucky critters i can sculpt in Blender 3D.


1

Posted by Yokomation - 5 days ago


iu_1318378_6434868.webp

Yes Ghidorah is now complete and ready for Retopology, like everyone else is now...

Pad myself on the shoulders, i may have Started the day out Eariler than normal BUT! i did it...


2

Posted by Yokomation - 6 days ago


no, im not fucking jokeing here,

he is almost done guys...

iu_1317976_6434868.webp

likely to get him done tomorrow, feet, wings and colors... i think.


3

Posted by Yokomation - 7 days ago


iu_1317401_6434868.webp

With Tomorrow been a day Where i Get Started in Sculpting for Monster zero and when that´s done it´s over to the Retopology, multires Sculpting and Textureing plus grooming for a few models

i got some current plans cooking in my head

and these plans are as fellow


1 Getting a few more Models done

with the Sculpting of the models used, im starting to think the Sculpting might Actually end up becoming a thing to fellow up RIGHT AFTER doing the model sheets(meaning there might no longer be model sheets posted here outside models been done) as after the thing with the models only takeing two days to do at most,

SO to kill off time when i do get things done and also a good way to sharpen my skills i might actually consider do a few more model sculpts, kept a rule to me to stick from 1 to 5 models at most

these are the chocies i made in a Blue sky thread

- Yoko Ruby and a Reptohound

- Alex, Conner, Akio the T-Rex and Tricreatops

- Doily, Nat, Kitube, Skittles and Grumpy

- Willa Brown(and Belty) and Hercy

- Mizu and Nemo

- Dasiy Hanna and Tyrancus(Cause why not?)

- Sealshrew and Fishpede

- Reggie and Hugo

- Susan and Khan

- Paradan and Rapturak

- Hornmoth, Redflame and Honomori

- O-Buta, Raion Kuma, Swamphorn and Boarffe

- Manny, Roberta, Ozzy and Arlo

- Piggypack and Gary

- Lythonax, Galli, Saurolophus and Rhomaleosaurus

- Regosuchus, Yokogator, Mulk and Vulturebat


currently just planning to do the Sculpts tho, checking on the time takeing me to do the Retopo, textureing and multires like i did for the sculpting might change this a bit, alos like i said i´d Only focus on a few for now BUT! everyone do need models so might be more of a good place to start than anything here, still i´d likely get eyes ready.

also i would had Loved to add the amber Spitter to these but, without a real model sheet i think it´s better to wait a bit with that, still like i said if i DO that Might be worth considering right after that model sheet is done i´ll get Amber spitter done(either to a Sculpt or fully done depending how the quickly the rest gose)

i did try to yesterday to do a art sculpt however felt like i wasn´t Feeling ready for it, that also led me to the whole check on the Time of sculpting and Yeah Planning a bit now, also Yoko Ruby needs a model, she is the mascot and i need a new model after deleteing the last one, knowing i Can get Sculpts done faster just means i can get her Ready in 2 days.


2 Ready for Writing?

this is mostly just for the Script or Scripts, i did Say i´d Like to make Jurassica Safari Park´s Script alongside the G.P.N and i got a good idea for the Story so far this is the Scripts i´d like to do


  • G.P.N 1(2 and 3 Maybe?)
  • Jurassica Just another day
  • a few DragoGen projects(one i have had in mind and with the Honomori and amber spitter in it)


doing these models was something i´d Like to do before i do Scripts tho BUT! feel like im getting Ready to Write maybe.

while No Quoll Alone, that´s mostly because of the got milk Script, but we´ll see.

3 Smaller Projects

this might also be why im Motivated to do more models right now to help me do more video projects,

like a sealshrew animation or T-Rex vs Trike, plus more animation from me is better.


4 Godzilla redesign?

Actually Yeah, if i Do wanna THAT! i think I might feature my owen take of Evovled Godzilla

as a good in between version for the current one and the new one in case i do wanna do another G.P.N Project.

iu_1317400_6434868.webp


UPDATE

i was Actually Fully prepared for monster Zero to take 3(4 with end date) Days to make BUT!

actually got him done alot faster as you can see, Yeah... currently just chilling a bit right now, than i´ll get ready for the next half, that actually been 4 of the Steps, Retopo and Uvmapping, Multires Sculpting and prep work for textureing, Textureing and bakeing those Textures, Basic rigging and weight pianting too, sounds like alot but the main reason is actually IF i do wanna get more models done and have those ready for those Steps, also like before i´ll likely start with Godzilla here fellowed by Anguirus and the Rest is for the Polls with mechagodzilla and King ghidorah been the last two.

iu_1318446_6434868.webp


2

Posted by Yokomation - 8 days ago


i checked out how long it took me to Sculpt the models i´ll be doing Retopo on so far

Sculpt time check here

Retopo Time check here

and to my fucking surprise, 2 days to Sculpt these models, this is not conuting end Dates

BUT! Yeah got Godzilla done in 2 days it seems, from head sculpt, Tooth Retopo, body sculpting, limb Sculpting, hands, Feet, Plates and poly pianting ALL OF THAT was done in a Span of 2 days (i Started Sculpting him on November the 25th and was done 27th of November)

iu_1317027_6434868.webp

even more shocking it took the same amount of time for Naoko to be done

(started on her December the 2nd and was done with her on the 4th of December)

im very surpised about this for good reason,

it only it takes me two days to do a model sheet, the same amount of time i has taken me to Sculpt these models, EVERYONE OF THE 8 MODELS I HAVE DONE AT MOST TOOK ME 2 DAYS AT MOST AND A MINIMUM OF 0 DAYS!

iu_1317028_6434868.webp


im not sure if it was the best thing to use to check and you can check in case you don´t Feel right about it BUT!

it is also worth noteing i too was shocked over it and changed site and... WELP 2 days it took me.

this is not with the Retopology, Multires Sculpting, Textureing, bakeing and Rigging included of course and i´ll likely do a B-Sky theard for that too BUT!

the fact it only took me 2 days to Sculpt a 3D Model of Godzilla is amazing and kinda eye opening for me.

starting on monster zero on sunday, gonna add him to the Theard too when i get him done, only got mechagodzilla done today... A MODEL I THOUGHT WOULD TAKE LONGER AND ACTUALLY SAVED HIM FOR LAST ALONGSIDE MONSTER ZERO, i need to let that settle in for a bit now.


2